Completely Rebuilt Featherlite 53' Cup Hauler
1. Lower lever completely demolished.
2. All new wood sub floor installed
3. New tile resilient flooring installed throughout 4. All new C-Tech cabinets installed similar to my 2017 Featherlite trailer we built and sold to Kaulig Racing. See attached Featherlite floor plan & elevations for the approximate layouts.
5. New roll-up door at large cart space opening on passenger side of trailer between the refrigerator and crew locker cubbies.
6. New refrigerator/freezer & microwave oven.
7. All new electrical power, plugs, and LED lighting on 1st & 2nd floors.
8. (2) new HVAC units in 1st floor work area. Lounge HVAC is existing split system that works very well.
9. Completely new screw lift gate with leveling feature. All new lights, added strip lights for night use for car under the lift gate. Wireless controls.
10. New pair or curb side entry doors.
11. Trailer just newly painted white. 4 side trailer panels were replaced where damaged by previous owner(s). Painted in late February, 2024.
12. Lounge completely demolished and rebuilt with completely new plastic laminate upper cabinets, below couch cabinets, new L-shape couch, new solid surface countertop at driver side of the lounge, new full height cabinets bulkhead between lounge and 1st floor work space. Walls & ceiling & lounge entry door have new plastic laminate paneling installed. New lights to be installed-(had to go race the Rattler 250 so the lights in the lounge were not installed yet).
13. All new tires-(8), new brake drums-(4), new brakes, new bushings and wheel bearings as needed, air ride suspension serviced and checked out completely, trailer suspension is tip top.
14. Fuel tank for generator installed in front of trailer landing gear 15. Generator serviced and works well. All new filters within the last month.
16. New trailer landing gear installed.
17. New roof coating applied to the entire trailer 2 weeks ago.
The trailer work was performed by Performance Trailers, Madera, CA.
Trailer painting done by McCray Enterprises, San Bernardino, CA.
New lounge by Millworks ON, Anaheim, CA.
New flooring by GK Flooring, Inc. I can get the flooring spec if needed and I have some extra tiles. Tiles 18" x 30"
Roof coating applied by Shell Roofing Solutions, Chino, CA.